Process & field piping
New production lines, plant extensions, equipment connections, supports and carefully planned tie-ins.
Explore service ↗Aamtron Group / FoodGradePiping
Food-grade piping contracting in UAE and Qatar: site installation, spool fabrication, welding, testing, passivation and commissioning.

OUR CONTRACTING SERVICES
New production lines, plant extensions, equipment connections, supports and carefully planned tie-ins.
Explore service ↗Drawing-led cutting, fit-up, welding, component assembly and identification for efficient site installation.
Explore service ↗Manual TIG, orbital TIG, MIG/MAG and stick welding, selected for the material, duty and joint requirements.
Explore service ↗Pipework for liquid food, dairy, beverages and cleaning circuits, coordinated with equipment and cleaning requirements.
Explore service ↗Inspection planning, agreed pressure/leak testing, cleaning and passivation with the required acceptance records.
Explore service ↗System checks, equipment interface support, punch-list closure, as-built records and an agreed handover package.
Explore service ↗FIELD EXECUTION
| Work package | What the scope can include |
|---|---|
| Survey & constructability | Site measurements, review of P&IDs and isometrics, equipment connections, access, routing and installation sequence. Process design approval and design responsibilities are agreed before execution. |
| Materials & traceability | BOQ coordination, component checks, identification, document review and protected handling of product-contact parts. |
| Spools & supports | Cutting, end preparation, fit-up, welding, spool identification, brackets and supports to approved details. |
| Product & CIP lines | Hygienic transfer lines, filling and mixing connections, CIP supply/return pipework and instrument or valve interfaces. Drainability and cleanability are reviewed with the process designer. |
| Utilities & equipment tie-ins | Associated water, compressed-air, steam or other utility connections within the approved piping specification. Product-contact and utility duties are identified separately. |
| Shutdowns & modifications | Work-pack planning, safe isolation coordination, controlled cut-ins, replacement sections and reinstatement within the agreed production window. |
| Inspection & system testing | Visual checks, weld records, agreed examination, pressure or leak tests and documented release points. Test media, pressures and safety arrangements require an approved procedure. |
| Cleaning, passivation & start-up | Approved cleaning and passivation scope, rinse and acceptance records, operational checks, punch-list closure and commissioning support. |
YOUR PROJECT PACKAGE
Share the country, site location, line list, process duty, tube sizes, material grade, connection standards and required installation dates.
Discuss your installation ↗LET’S BUILD YOUR NEXT LINE
Useful answers
Material supply, pipe and spool fabrication, manual TIG, orbital TIG, MIG/MAG or stick welding, field installation, testing, cleaning, passivation and commissioning. The quotation sets out the agreed deliverables and interfaces.
Yes. Discuss plant extensions, replacement pipework, equipment connections and shutdown tie-ins. Access, isolation, permits and restart requirements must be coordinated with the plant team.
Installation is focused on the United Arab Emirates and Qatar. Other listed countries are material supply destinations; any overseas site work requires a separate agreement.