AAMTRON GROUP · FOOD & BEVERAGE PROCESS PIPING
UAE +971 50 234 1445Qatar +974 4472 6271
Aamtron GroupFoodGradePipingEngineering the connectionsDiscuss your project
Stainless steel process pipework in a food production facility

UAE & QATAR CONTRACTING · INTERNATIONAL SUPPLY

Food-grade piping.
From source
to start-up.

Food-grade materials. Skilled fabrication. Complete site installation. Aamtron connects your process with the people, components and workmanship it needs.

FOOD & BEVERAGEHYGIENIC PROCESS LINESMATERIALS TO COMMISSIONINGDiscover more ↓
UAE + QatarSupply, fabrication & installation
Middle EastRegional material supply
UK · Europe · AfricaInternational material supply

01 / THE COMPLETE PIPEWORK SCOPE

One coordinated scope.
Every stage of your line.

From a component schedule to a site installation, we handle food-grade piping supply and contracting in the UAE and Qatar. Start with the scope your production facility needs.

01 / Site installation

Process & field piping

New production lines, plant extensions, equipment connections, supports and carefully planned tie-ins.

Explore service ↗
02 / Fabrication

Pipe spools & assemblies

Drawing-led cutting, fit-up, welding, component assembly and identification for efficient site installation.

Explore service ↗
03 / Welding

The right process for every joint

Manual TIG, orbital TIG, MIG/MAG and stick welding, selected for the material, duty and joint requirements.

Explore service ↗
04 / Hygienic systems

Product transfer & CIP circuits

Pipework for liquid food, dairy, beverages and cleaning circuits, coordinated with equipment and cleaning requirements.

Explore service ↗
05 / Quality & release

Testing, cleaning & passivation

Inspection planning, agreed pressure/leak testing, cleaning and passivation with the required acceptance records.

Explore service ↗
06 / Production readiness

Commissioning & handover

System checks, equipment interface support, punch-list closure, as-built records and an agreed handover package.

Explore service ↗
Manual TIG welding of a stainless steel pipe joint

02 / WELDING & FABRICATION

Craft at the joint.
Confidence in the line.

Manual TIG and automated orbital TIG for hygienic piping. MIG/MAG and stick welding for suitable process, utility and fabrication applications. The method follows the specification.

Manual TIGOrbital TIGMIG / MAGStick / SMAW
Explore welding services ↗

03 / MATERIAL SUPPLY

Every component.
A considered connection.

Build a complete procurement package around your process: tubing, sanitary fittings, valves, seals, hose assemblies and installation accessories.

05 / LOCAL PRESENCE. INTERNATIONAL REACH.

Your destination.
Our next conversation.

06 / A CLEAR PATH TO DELIVERY

Define. Fabricate. Install. Verify.

01

Define the scope

Drawings, operating conditions, material schedule and programme.

02

Prepare the work

Procurement, fabrication, welding procedures and site coordination.

03

Connect the line

Supports, spools, equipment interfaces and planned tie-ins.

04

Verify & hand over

Agreed inspections, tests, cleaning, commissioning and records.

LET’S BUILD YOUR NEXT LINE

Let’s move your
process forward.

Request a quotation ↗